The project will provide a new Firewater system (based on Sea water) in parallel with the existing one.

The existing firewater system will be changed to utility water service.

The project will provide procurement, installation, pre-commissioning and commissioning & start-up assistance of Firewater Pumps, Firewater Piping Networks, Fixed Spray System, Fire Protection Devices, Chlorination Generation System, Distribution Control System, Flame Detection System, Linear Heat Detection System, Audible Alarm System (Sirens), CCTV System and Tank Dewatering System including associated civil, structural, piping, mechanical, electrical, instrumentation and telecom works.

 


Construction From: 07/2020
Construction To: 12/2023
Contract Amount (IN "000" US$): 97,000
Archirodon Portion: 100%
Owner: Saudi Aramco
ID: 11097