Project Description

The Project consists of the Engineering, Procurement, Construction, Pre-commissioning and Assistance in Commissioning of two Packages in Al Dabb’iya Thamama Zone B Transition Zone.

Al Dabb’iya Transition Zone B Phase I Development:

•Two new Clusters (Cluster DD & Cluster CC) including production manifold and associated flowlines, gas and water injection system, multiphase flowmeter, chemical injection skid, closed drain system, maintenance flare package, pig traps, letdown station, ETR, ITR, etc.

•New de-centralized water injection system including water surface pump, two water supply wells and one water disposal well

•Additional water injection pump (fixed speed) installed in CPP phase III running in parallel with the existing Phase III water injection pumps

•New 33 KV Over Head Line (OHL) to these new clusters

•Oil Producer Pipeline from CLS-CC to CLS-N and from Cluster-DD to Cluster-Q

•New Water injection pipeline

•Gas injection pipeline from Cluster-S to Cluster-DD, Cluster-M to Cluster-CC

•Tie – in of two wells (1 Oil Producer & 1 WAG injector) in Cluster L

•Tie - in of one Oil Producer well in Cluster Q

Restoration of Al Dabb’iya Production of Other Zones

•Brownfield scope of work in existing Dabb’iya clusters (Q,L,S,T,U,V, L and W).

•Tie-in of new oil produced wells in clusters S,B,U,V,L and W

•Tie-in of new WAG injectors in clusters T,B,U,W

•Tie-in with the existing water injection and gas injection pipeline network

•Installation of new chemical injection skids where required

•Tie-in with existing chemical injection packages where required

•Interface with previous project of downhole chemical injection to provide the necessary tie-ins to the oil producers requiring downhole chemical injection packages

•Tie-in with the existing clustering facilities: production and test manifolds, water injection and gas injection manifolds, gas letdown stations and closed drain/vent systems

•Extension of the existing facilities where required to accommodate the additional wells

Additional Miscellaneous Piping Upgradation Works in Dabb’iya CPP Ph1 area

 


Construction From: 09/2018
Construction To: 02/2021
Contract Amount (IN "000" US$): 166,000
Archirodon Portion: 100%
Owner: Abu Dhabi Company for Onshore Petroleum Operations Ltd. (ADNOC Onshore)
ID: 09055