The project included the construction of a 763m long and 35m wide precast pre-stressed segmental cable stayed bridge with a 405m long main span and two side spans, each 179m long. The north and south piers are 72 m and 80 m high to the underside of the 5 m deep deck; above are two 90m high towers.
Each pier foundation consists of 100 nos. bored cast in-situ reinforced concrete piles of 1,180 mm dia. with lengths varying between 8m and 26 m.