The project included the construction of a 763m long and 35m wide precast pre-stressed segmental cable stayed bridge with a 405m long main span and two side spans, each 179m long. The north and south piers are 72 m and 80 m high to the underside of the 5 m deep deck; above are two 90m high towers.
Each pier foundation consists of 100 nos. bored cast in-situ reinforced concrete piles of 1,180 mm dia. with lengths varying between 8m and 26 m.

 


Construction From: 04/1993
Construction To: 06/1999
Contract Amount (IN "000" US$): 54,000
Owner: Ministry Of Transport