The Phase 1 expansion of the Port includes hydrographic studies, soil investigation and complete detailed design of quay walls, dolphins, breakwaters, revetments, reclamation and external works.

The main items of work comprise :

a. Dredging, including deepening of existing navigational channel from -6.0m to - 9.0m, turning circle, deepening of North Basin from -1m to -8.5m and East basins and Port berth from -1.0 to -5.5m together with provision of navigational aids (buoys and beacons).

b. Berths (Quaywall), including Design and Construction of quay wall of length 504m at -8m and top level at +3.00 for small craft berth (for general cargo) to receive ships of capacity 15,000 DWT and 711m long quaywall at -5.5m top level at + 2.5m for coast guard berths respectively with rockfill foundation, superstructure with reinforced concrete precast blocks and situ capping beam together with wharf fittings.
Construction of 2nos dolphins and walkways at ferry terminal

c. Breakwaters and Revetments, including design and construction of two rubble mound breakwaters of total length 2208m for safe berthing facilities. The breakwater will be constructed with foundation blanket, core rock, under layer and armour rocks and associated revetments.

d. External Works, including asphalting, heavy duty concrete paving, concrete foundations for lighting poles, fencing and drainage pipeline

Construction From: 12/2014
Construction To: 10/2018
Contract Amount (IN "000" US$): 97,300
Archirodon Portion: 100%
Owner: Seaports Authority (SEAPA), Riyadh, Saudi Arabia
ID: 02069