The turnkey project include the design, supply, construction and commissioning of the works for a 3x350 MW power plant.

The main items of work comprised :
  • Offshore Works, including intake, outfall and shore protection, etc
  • Onshore Works / Buildings and Civil Works, including pumphouse, cofferdam, industrial buildings, non-technical administration and facilities buildings, roads, bridges and pavements, drainage and water supply network, etc.
  • Tank farm consisting of 6 nos. fuel oil tanks of 100,000 m3 capacity, 2 nos distilled water tanks of 27,200 m3 capacity and 4 nos. other tanks of 4,500 8,700 m3 capacity together with associated piping, valves and fittings.
  • Electro-mechanical Works, including substations, power supply & distribution networks, lighting system for buildings, area lightings, fire protection and fire fighting systems, etc.
Construction From: 09/1998
Construction To: 09/2002
Contract Amount (IN "000" US$): 835,247
Archirodon Portion: 143,523 (17%)
Owner: Saudi Electricity Co. Western Region Branch
ID: 11018