Project Description

The EPC project included dredging of harbor basin to -13 m to cater four new berths and using the dredged material for reclamation. The dredged material was disposed-off in a controlled manner by constructing the containment dike to surround the disposal site. The project also included the construction of 2,600 m long containment dike of which 525 m long x 5 m deep wiidth at bottom 20 m and at top 0.50 m is constructed using the dredged cap rock material.

Construction From: 03/2002
Construction To: 02/2003
Contract Amount (IN "000" US$): 17,209
Archirodon Portion: 100%
Owner: Sabic Terminal Services Co. (SabTank)
ID: 11055