The project included the construction of two marine composite bridges at Palm Jumeirah Island, connecting the main crescent to two other smaller islands. The first bridge is 290m in length, consisting of 7-spans and the second bridge is 210m in length, consisting of 5-spans. The maximum span is 50m.