The project included widening of the marine gate from 150m width to 240m width.
Photo Gallery
The project included widening of the marine gate from 150m width to 240m width.
dredging of the navigation channel to -16.4m depth, demolition of 90m length of existing breakwater and restore the head of breakwater, relocation of the buoys, installation of a new piled beacon light, power supply to navigational aid, installation of Current and Level meters, maintenance of landing facility and cathodic protection works.