Project Description

The project included widening of the marine gate from 150m width to 240m width.

The works involved :

dredging of the navigation channel to -16.4m depth, demolition of 90m length of existing breakwater and restore the head of breakwater, relocation of the buoys, installation of a new piled beacon light, power supply to navigational aid, installation of Current and Level meters, maintenance of landing facility and cathodic protection works.

Construction From: 03/2004
Construction To: 08/2005
Contract Amount (IN "000" US$): 8,440
Archirodon Portion: 100%
Owner: Saudi Arabian Oil Co. (Saudi Aramco)