Project Description

The project included the construction of all infrastructure works containing all services, roads and paving and sea wall for the 12 Km of the Cressent of Palm Jumeirah artificial Island in Dubai.

The main items of work comprised :
  • 11Km asphalt road network (single and double carriageway)
  • Parking and sidewalks with paving tiles
  • Storm drainage network (total length: 7.5 km)
  • Potable water system (total length: 5.6 Km)
  • Irrigation water system (total length: 8.3 Km)
  • Chilled water system (total length: 17 Km)
  • Gas network (total length: 10.5 Km)
  • Electrical works including substations, cables, ducts and street lighting.

 

 

 

Construction From: 07/2003
Construction To: 01/2007
Contract Amount (IN "000" US$): 39,261
Archirodon Portion: 100%
Owner: Nakheel
ID: 01037