Project Description

The project included the detailed engineering, procurement and construction of the Seawater Intake and Outfall system for the Elixier 2 Air Separation Plant for Nitrogen Generation at Mirfa, Abu Dhabi. 

The main items of work comprised :
  • Detail engineering, material supply and construction of civil works for intake and outfall structures
  • Construction of pump area slabs and a substation building at intake.
  • Detail engineering, material supply & installation for HDPE pipes of 800mm dia and 900mm dia for seawater intake and outfall piping
  • Supply HVAC & minor electrical & instrumentation erection material.
  • Installation of all equipment supplied by Main Contractor.
  • Construction of entire scope for Electrical and Instrumentation.
  • Intake caisson incl. suction filters with access bridge
  • SW Substation incl. HVAC and pump area included Chlorination Unit with tank, Tapis backflash system, Vacuum Unit, Valves, Pumps, Debris-Filters
  • SW intake and outfall pipeline : Supply and Installation of  Intake pipe of 800mm dia HDPE pipe of 4600meter length and outfall pipe of 900mm dia HDPE pipe of 2800meter length,
  • SW outfall diffuser
  • Interconnecting piping
  • Installation GRP pipes including lamination (materials issued by client free of cost)
  • Equipment erection  (Pumps, chlorination units, debris filter, tapis filter and Vacuum unit)
  • Associated civil works (roads included)
  • Associated instrumentation and electrical works
  • Associated steel structure works

 

 

Construction From: 02/2010
Construction To: 04/2011
Contract Amount (IN "000" US$): 26,661
Archirodon Portion: 100%
Owner: ELIXIER/GASCO Main Contractor: LINDE Engineering Middle East LLC
ID: 01066