Home

Top Menu

Project Description

The project included construction of infrastructure for a modern container terminal of 80 ha, fully equipped to handle up to 4 million TEU per annum.

The main items of work comprised :
  • Excavation, leveling and consolidation of existing ground and construction of pavement for container storage.
  • Construction of railway container station with two tracks of approx. 1200m length.
  • Construction of a 4-storey administration building (4,800 m2), a workshop building (4,500 m2) and a 2-storey amenity building (1,000 m2).
  • Installation of 60m high lighting poles, electric and IT cable conduits and construction of draw pits.
  • Construction of electric substation and provision of electric power supply system.
  • Rain water drainage system, fresh water and fire fighting networks and facilities for sewage collection and disposal.
  • Installation of reefer racks.

 

Construction From: 06/2008
Construction To: 09/2011
Contract Amount (IN "000" US$): 96,697
Archirodon Portion: 100%
Owner: Damietta International Port Company
ID: 01085

Testimonials