The project included engineering, procurement, installation, construction and commissioning of a fully operational treatment plant. The plant is fully automated controlled from control room through Honeywell DCS control system, has also a Chemical Lab fully equipped and the quality of the Water is automatically monitored.

The main items of work comprised :
  • Intake and seawater pump and chlorination system. New sub-sea pipeline for seawater intake consists of HDPE pipes 500 l.m.
  • Pre-treatment system including chemical dosing and cleaning system.
  • Seawater Reverse Osmosis desalination system including intermediate tanks and chemical dosing.
  • Subsea outfall pipe for the disposal of waste brine consists of HDPE pipes 350 l.m.
  • Post Treatment (Remineralization)
  • Product Distribution: Two new product storage tanks, transferring pumping station and interconnection pipe to the existing potable water tanks, interconnection pipe to TEPQ and to new control camp.
  • Auxiliary systems and all the associated electrical, instrumentation and loss prevention.
  • The provision of all necessary safety equipment.
  • Civil works intake pump house building, Potable water Tank Compound and New Desalination Plant Building

 

Construction From: 03/2011
Construction To: 08/2013
Contract Amount (IN "000" US$): 52,992
Archirodon Portion: 100%
Owner: Qatar Petroleum
ID: 09001