The project included marine works element of the small Ship repair yard, known as "Phase 5 of the Nakilat Shipyard".

The main items of work comprised :
  • Construction of a Travel Lift Structure
  • Construction of Service Jetty for the Floating Dock Berth structures with associated link bridge structures and approach ramp etc.
  • Load out QW intake.
  • Foundations for Tower Crane Bases
  • Pontoon for small ship repair.
  • Cathodic corrosion protection services associated with the above marine structures.

 

Construction From: 07/2011
Construction To: 07/2012
Contract Amount (IN "000" US$): 21,753
Owner: Qatar Petroleum Agent: Qatar Gas Transport Company Limited (Nakilat)
ID: 09009