Project Description The project included marine works element of the small Ship repair yard, known as "Phase 5 of the Nakilat Shipyard".
The main items of work comprised :
- Construction of a Travel Lift Structure
- Construction of Service Jetty for the Floating Dock Berth structures with associated link bridge structures and approach ramp etc.
- Load out QW intake.
- Foundations for Tower Crane Bases
- Pontoon for small ship repair.
- Cathodic corrosion protection services associated with the above marine structures.
Construction From: 08/2011
Construction To: 08/2012
Contract Amount (IN "000" US$): 21,753
Owner: Qatar Petroleum Agent: Qatar Gas Transport Company Limited (Nakilat)
ID: 09009