A. Construction of Breakwater, Dredging and Reclamation:
- Dredging of the harbour basin and turning circle to -18 m CD level and the approach channel and entrance to -18.5 m CD.
- Construction of the new breakwater (about 2850 m long) – comprising rock core, rock armour, accropodes and concrete crest wall.
- Dismantling a portion of the existing breakwater. iv) Construction of bund between the new and the existing breakwater and reclaiming the enclosed area with dredged material/quarry run.
B. Construction of Container Berths and Associated Works:
- Civil works for construction of a 969 m long new quay structure for Container terminal (Berths 5&6) in Salalah Port, in continuation of the existing Container Berths Nos 1 to 4.
- Development of 345 m wide additional container yard on the upland areas of Berths Nos 5 & 6 including construction of supporting structures / systems for containers and yard equipment, roads, pavements, electro-mechanical services and communication.
- Miscellaneous marine works, provision of marine furniture. iv) Utility buildings and services