The project included the design, furnishing, construction and operations of a marine terminal for the loading of petroleum products and coke.

The main items of work comprised :
  • Dredging and rock filling of foundation for the project jetty
  • Construction of jetty structure complete with selected granular backfill, core fill and compacted earth fill together with complete concrete structure and necessary equipment and controls.
  • Piling works to support the jetty structure.
  • Installation of two nos. mooring buoys
  • Tank Farm consisting of: One 6,000 m3 fixed roof kerosene, one 6,000 m3 floating-roof gasoline tank, three 2,000 m3 fixed-roof tanks for untreated ballast water and two fixed-roof tanks 800 m3 and 300 m3 for storage or recovered oil and diesel respectively.
  • Site preparation, service roads, equipment foundations, building foundations, culverts and pipeline installation
  • Containment dikes around onshore tanks
  • Receiving, unloading and erection of traveling shiploader for petroleum coke
  • Erection of bulk conveyor system for petroleum coke
  • Product transfer pumping stations and oily water separation plant together with all associated piping, valves and fittings, etc.
Construction From: 06/1999
Construction To: 03/2001
Contract Amount (IN "000" US$): 39,200
Archirodon Portion: 100%
Owner: Middle East Oil Tankage and Pipelines Co. (MIDTAP)