The project included the construction of 3 berths to handle seagoing tankers ranging from 3,000 dwt to 80,000 dwt.

The main items of work comprised :
  • a loading platform
  • 5 nos. breasting dolphins
  • 4 nos. mooring dolphins
  • an access trestle
  • 6 nos. catwalks all supported on tubular steel piles, concrete works and associated structural steel together with wharf fittings.

The mechanical works include

  • HVAC
  • firewater system
  • potable water system
  • slop water systems
  • substation
  • cables
  • switchgear
  • lighting and navigational aids

Also includes

  • roads
  • pavings
  • culverts
  • building works
Construction From: 10/2006
Construction To: 02/2009
Contract Amount (IN "000" US$): 50,667
Archirodon Portion: 25,333 (50%)
Owner: Royal Commission for Jubail and Yanbu Directorate General for Jubail Projects