The project included the design furnishing, construction, testing and commissioning of a new tanker terminal at the desalination plant to accommodate vessels of between 40,000 dwt and 100,000 dwt and designed for vessels up to 200,000 dwt.

The main items of work comprised :
  • Unloading platform
  • Two berthing dolphins
  • Four mooring dolphins
  • Approach way or causeway in the shallow water and a trestle structure in deep water
  • Dredging and excavation works
  • Ancillary buildings, roads and sewage system

All the structures such as trestle structure, unloading platform and dolphins are constructed on tubular steel piles.

All services including electro-mechanical works and potable water supply system.

Construction From: 08/1999
Construction To: 02/2002
Contract Amount (IN "000" US$): 36,415
Archirodon Portion: 100%
Owner: Saline Water Conversion Corporation
ID: 11064