The turnkey project included the design, supply, construction, installation, testing and commissioning of a 6 x 370 MW units steam turbine power plant.

The main items of work comprised :
  • Site preparation, soil improvement and site services including landscaping & irrigation, waste water & storm water drainage, evaporation and waste water holding ponds, potable water system and water treatment system, roads & sidewalks, etc.
  • Buildings and structures including steam generation & power generation buildings, industrial & process buildings, water production and treatment buildings electrical control building, cooling water pumphouse, warehouse, chimney and other buildings and foundation works, etc.
  • Fuel oil handling system and storage tanks, diesel tanks and water tanks, etc.
  • Seawater main cooling water pipe work, discharge culverts and channels
  • Cable tunnels, cable duct banks & trenches, pipe and cable racks, etc.
Construction From: 12/2003
Construction To: 03/2008
Contract Amount (IN "000" US$): 1,816,369
Archirodon Portion: 284,500 (16%)
Owner: Saudi Electricity Company
ID: 11044