Home

Top Menu

Project Description

The project included the Design and Construction of Marine Structures, Dredging and Reclamation at Khalifa Port and Industrial Zone including design, procurement and construction of breakwaters, revetments, quay walls, dredging and reclamation of Phase 1A development of the greenfield offshore Khalifa Port. The scope of work involves the development of Phase 1A of the Port which is anticipated to have an annual throughput of 2 million TEU’s and over 6 million tonnes of general cargo through the creation of a 260 hectare marine platform. The island platform is made from reclaimed seabed material that is dredged to create the harbor basin, 16m deep and the 16.5 meter deep and 12 km long approach channel. The outer perimeter of the port island is protected by rock revetments and breakwaters. An Environmental Breakwater is constructed to protect the marine environmentally sensitive areas. The island platform is accessed from the shore by a 3.2km causeway and a 1km long highway bridge. Also included construction of 1km long utility bridge. In addition, the contract also included the construction of a 3.5 km causeway/trestle and an 800 m long berth for the use of Emirates Aluminum (EMAL).

Construction From: 09/2007
Construction To: 09/2010
Contract Amount (IN "000" US$): 1,588,462
Archirodon Portion: 795,551 (49%)
Owner: Abu Dhabi (U.A.E.)
ID: 01092

Testimonials

No Testimonials Defined