The project included the Engineering, Procurement and Construction of the Import Jetty and the  Seawater Intake system for Qatalum Plant within the Mesaieed Industrial City.

The main items of work comprised :
  • Construction of 300m long Jetty (Berth 8), to handle the import of raw materials, 123m long approach trestle, cat walk, mooring dophin
  • Provision of two seawater intake systems with pipe-work within a 90m long section of blockwork quay wall (Berth 7) at the stem of the jetty,
  • Reclamation works for the Qatalum access corridor,
  • Block paving in the container yard of 11000m2
  • Shore protection on both sides of the block work quay wall and
  • Dredging of pockets for berth and quay wall foundation.

 

 

Construction From: 07/2007
Construction To: 08/2009
Contract Amount (IN "000" US$): 100,862
Archirodon Portion: 100%
Owner: Qatar Petroleum and Hydro Aluminium A.S
ID: 01091