The project includes design, furnishing, installation and construction of Civil, Architectural, Electrical and Mechanical works for Banha 750 MW Combined Cycle Project. The project consists of one combined cycle module configured as 2 x 250 MW Combustion Turbine Generator, two Heat Recovery Steam Generators and one 250 MW Steam Turbine Generator.

The main items of work comprise :

1. Site Preparation

2. Piling Works

3. Concrete Works

4. Structural Steel Works

5. Architectural and Electromechanical works for buildings:

  • Combustion Turbine Building
  • Steam Turbine Building
  • Control / Electrical Building
  • Circulating Water pump house
  • Circulating Water Electrical Building
  • Circulating Water Intake and Discharge Structures
  • Administration Building
  • Warehouse / Workshop Building
  • Fire Station, Security Offices and Toilet Facilities
  • Underground Piping

7. Underground Electrical Duct Banks

8. Circulating Water Pipes

9. Landscaping and irrigation systems

10. Roads, finish grading and drainage, etc.

 

Construction From: 10/2011
Construction To: 05/2015
Contract Amount (IN "000" US$): 70,108
Archirodon Portion: 100%
Owner: Middle Delta Electricity Production Company (MDEPC)
ID: 09007