The project included design, furnishing and construction of the offshore cooling water facilities and all services associated with these facilities for the Sidi Krir Units 3 & 4 Power Project.

The main items of work comprised :
  • Two offshore cooling water intake structures
  • Two offshore cooling water discharge diffusers
  • Installation of two intake pipes from the two offshore intake structures to onshore circulating water pumps house interface location.
  • Installation of two discharge pipes from the offshore discharge diffusers to the onshore interface location.
  • Dolphins and warning signs
  • Chlorine piping system
  • Precast concrete block rip-rap protection
Construction From: 06/1999
Construction To: 01/2001
Contract Amount (IN "000" US$): 20,385
Archirodon Portion: 100%
Owner: Intergen Sidi Krir Generating Co. Egypt Main Contractor : Bechtel International Inc. Gaithersburg