The turnkey project included engineering, procurement, construction, commissioning and start-up of a new cooling water system including inlet and outfall pipelines and extension of the container yard.

The main items of work comprised :

Civil works:

  • Quay wall of 390 m long including dredging, pre-casting and placing of quay wall blocks, cast in situ capping beam, etc.
  • Pump House approx. 20.1m x 36.2 m
  • Intake GRP pipelines (2 Nos.) of 1.800 mm dia each (Discharge pipeline and Offshore pipeline system)
  • Low Voltage Building
  • Reinforced concrete culverts, trenches, etc
  • Chlorination tank area

Electromechanical works:

  • Installation and commissioning of 6.6 KV cables for seawater pumps, LV/MV transformers, electrical panels, etc.
  • PA/GA and fire alarm systems for the pump house area as well as instrumentation and PLC control systems.
  • Utility networks including HVAC system.
Construction From: 12/2005
Construction To: 07/2009
Contract Amount (IN "000" US$): 98,107
Archirodon Portion: 100%
Owner: Qatofin Company Ltd. Doha, Qatar
ID: 01054