The project included detailed engineering, procurement and construction of four berths on gravity structure comprising of common approach jetty and back to back R.C. loading platform, breasting and mooring dolphins and catwalks. The relieving platform is constructed on bored concrete piles.The contract also included construction of a common building, electric substation, fire fighting facilities, navigational aids, oil spill control equipment and lighting amongst other topside installations as well as testing and commissioning of the project.

Construction From: 03/2003
Construction To: 09/2005
Contract Amount (IN "000" US$): 50,475
Archirodon Portion: 100%
Owner: Qatar Petroleum Engineering Dept. (Onshore) P.O. Box 3212 Doha, Qatar Tel.: (974)4402697 Fax: (974)4402897 Contact Person: Mr. Ali Ahmed Al-Muhannadi Asstt. Engineering Manager