Home

Top Menu

Project Description

The project included dredging of approx. 10 sq. km. areas to a depth of 2 m from the operation brine level, of salt formations, reefs and salt mushrooms from certain areas within salt pan (SP1 and SP2) forming a part of the solar evaporation system and subsequent deposition of the material resulting there from in spoil areas designated for this purpose. The Site was located at the Arab Potash Company's existing works at the South end of Dead Sea approx. 230 km from the Port of Aqaba and 130 km from Amman.

Construction From: 03/1999
Construction To: 10/2001
Contract Amount (IN "000" US$): 21,063
Archirodon Portion: 100%
Owner: The Arab Potash Co. Ltd.
ID: 01017

Testimonials

No Testimonials Defined