The project includes the design, fabricate, supply, install, construct, and commissioning of the KAUST Harbour.
The main items of work comprise :
  • Dredging of the Channel within the existing harbour to navigational depth of -7.5 SAVD with minimum width of 55m
  • Dredging the maneuvering area to -6.5m SAVD with nominal diameter of 170m
  • Existing intake pipelines protection with special means such as silt curtain.
  • New open piled quay wall
  • Navigational Aids
  • South side floating jetties
  • Modifications to the existing dock
  • Marine testing equipment such as Vertical Calibration/Ballast & Hydraulic Compression Vessel.
  • Harbour Shoreline cleaning

 

Construction From: 11/2011
Construction To: 11/2013
Contract Amount (IN "000" US$): 25,265
Archirodon Portion: 100%
Owner: Saudi Arabian Oil Company (Saudi Aramco