Project Description

The project includes the marine works for the seawater intake and discharge channels at Yanbu Power and Desalination Plant (Phase 3 - Package D)

The main items of work comprise :

a) Seawater intake and channel: Consists of closed intake channel with breakwater and 13 nos. Glass Reinforced Plastic (GRP) Pipes of dia. 4,000 mm and 60 m long each line, precast concrete bell mouth and thrust block units, stainless steel gratings for inlet bellmouth units.
b) Seawater Discharge Channel with a Breakwater
c) Seawater outfall Structure
d) Shore Protection
e) Temporary Jetty
f) Oil Barrier and Collection System
g) Navigational Beacons

Construction From: 03/2014
Construction To: 03/2016
Contract Amount (IN "000" US$): 26,766
Archirodon Portion: 100%
Owner: Saline Water Conversion Corporation (SWCC)
ID: 11026