Shoaiba Steam Power Plant Stage I, Phase 1 (3 x 350MW) Saudi Arabia (Project in consortium with ALSTOM Power)

The turnkey project include the design, supply, construction and commissioning of the works for a 3x350 MW power plant.

Jeddah R.O. Phase 3 Project. Subcontract for Dual Media Filter Building Works. Jeddah, Saudi Arabia

The project included the Dual-Media-Filter Building works at Jeddah R.O. Plant (phase 3)

Yanbu Power and Desalination Plant - Phase 3 - Package "T" Tanker Terminal – Subcontract works for Offshore Terminal

Engineering, Procurement and Construction of an Offshore Terminal, including a Jetty, to accommodate the oil tanker vessels of capacity ranging from 20,000 DWT to 100,000 DWT

Shoaiba Power Plant Extension, Stage III (3 x 397 MW), Saudi Arabia

The turnkey project included the design, manufacture, procurement and delivery of material and equipment to the work site and installation, erection, construction, testing, commissioning of a 3X397 MW units steam turbine Power Plant.

Seawater Cooling System Expansion at Yanbu

The project included engineering, procurement and construction for expansion of seawater cooling supply and return lines to serve industrial growth and to the growth in the steam power generation and desalination plant and to improve reliability of seawater supply in northern sector petroleum area.

YANSAB Olefins Plant 1 - Precast Concrete Pipe Racks

Qatar - Messaieed : Revamping for Methanol Plant

The project included engineering design, procurement, construction, installation, testing and pre-commissioning of the methanol plant modifications for the Carbon Dioxide addition project.

Rehabilitation of Concrete Structures in Jubail Desalination Plant - Contract No. 2

The project included concrete repair and rehabilitation works for various areas and structures of desalination plants under Phase I & II

Shoaiba III IWPP Steam Turbine Power Plant. Subcontract for Design and Construction of Chimney Shoaiba, Saudi Arabia

The project included basic and detailed design and supply and erection of chimney including necessary temporary works, excavation and foundation works as well as commissioning of systems and equipment. A single wind-shield chimney with three flue gas pipesis having an outer wind-shield of reinforced concrete construction