EPC for BAB 485 MBD Sustainable Facilities Project

The Sustainable Facilities Projects - BAB Onshore Oil Field is located in Abu Dhabi, in the UAE.

The Engineering, Procurement, Construction Contract includes FEED verification, detailed engineering, procurement, construction, pre-commissioning and commissioning assistance.

The scope of works is divided in three packages:
1.    BAB Additional 35 MBD Package
2.    BAB Artificial Lift Package
3.    BCDS Modification Package

Contract No. 16721.01 EPC For Al Dabb'iya Thamama Zone B Transition Zone Developments – Phase I (15 Wells) & Restore Al Dabbi’ya Other Zone (Oz) Production (17 Wells)

 

The Project consists of the Engineering, Procurement, Construction, Pre-commissioning and Assistance in Commissioning of two Packages in Al Dabb’iya Thamama Zone B Transition Zone.

 

Al Dabb’iya Transition Zone B Phase I Development:

 

Contract no. 6600040127 Upgrade Pier Facilities at Tanajib

Tanajib is an oil complex owned by the Saudi Arabian Oil Company (Saudi Aramco), located on the coast of the Arabic Gulf, about 200 km north of Dammam in the Eastern Province of Saudi Ara

UAE, Abu Dhabi, Al Dabb’iya Surface Facilities – Construction of Offshore Pipelines and Offshore Clusters

 

Construction/Pre-commissioning of offshore Pipelines:
• Offshore pipelines used for conveying oil, gas and water products.
• Carbon steel pipes. Pipe sizes 4” to 28”. Total length 98km.
• Offshore Fiber Optic cable (10km)
• Offshore Composite cables (46km)
• Dredging of pipeline corridors 2,500,000 m3
• Cathodic protection on offshore pipelines

Fuel Oil Receiving Terminal for Shoaiba Power Plant

The EPC project included a marine terminal for oil tankers ranging in size from 20,000 to 100,000 tonnes with facilities for unloading crude and heavy fuel oil and include the following civil, mechanical, instrumentation and electrical works.

Petrochemical Berth 36 - Offshore Works, Jubail

The project included the construction, takeover of design responsibility of new petrochemical berth to receive tankers of up to 50,000 dwt and be capable to accommodate tankers of up to 80,000 dwt.

Qatar - Messaieed : Revamping for Methanol Plant

The project included engineering design, procurement, construction, installation, testing and pre-commissioning of the methanol plant modifications for the Carbon Dioxide addition project.

Qatar - Ras Laffan : LNG Berth No. 5

The project included the Procurement and Construction of the Marine and Civil Works for LNG Berth 5, as part of Qatar Gas II Development Project.