The project includes engineering, procurement, construction, commissioning and start-up works of the Jetty at Hamriyah Port.

The main items of work comprise :
  • Detailed engineering for breakwater repair, widening and protection.
  • Installation, testing and pre-commissioning of various services and utilities such as fire fighting piping and pumps, firewater system, slop tanks, utility water pipes, instrument air, and potable water system.
  • Marine loading/offloading arms
  • Product transfer pipelines - carbon steel pipes of 16" dia. for an approx. length of 3,000 lm.
  • Metering skid
  • Cathodic protection
  • Electrical power system
Construction From: 11/2011
Construction To: 05/2016
Contract Amount (IN "000" US$): 79,452
Archirodon Portion: 100%
Owner: Abu Dhabi Oil Refining Company (TAKREER)