Home

Top Menu

Project Description

The project include works for converting the existing simple cycle power plant to combined cycle power plant.
The plant will include one (1) power block module. The module 4x4x1 consists of existing four (4) 125 MW (nominal ISO) combustion turbine generators (CTGs), GE Frame 9E, installed and commissioned during year 2012. Each CTG feeding exhaust gases to its respective heat recovery steam generator (HRSG), two pressure level and non-reheat. Steam from the four HRSGs will be fed to one 250 MW (nominal), condensing steam turbine generator (STG), equipped with air-cooled condenser (ACC). The estimated facility net output will be approximately 750 MW (nominal, ISO)

The main items of work comprise :

1. Site Development

2. Underground Utilities
(Drainage System, Fire Protection System, Potable Water System, Sanitary System, Waste Water System, Closed Cooling Water System, Condensate Water Transfer System, Compressed Air System, Chemical Waste Neutralization System)

3. Power Generating Facilities
(Four (4) Heat Recovery Steam Generators (HRSG), Four (4) HRSG DCS Cabinet Room Facilities, Four (4) Continuous Emission Monitoring System CEMS, Four (4) Boiler Slowdown sumps Facilities, Two (2) HRSG Chemical Injection Skid Facilities, Four (4) Steam/Water analysis system (SWAS), One (1) Steam Turbine Generators Buildings and One (1) STG Pedestals, One (1) STG Lube Oil Transfer Pumps & Tank,  One (1) Control/Electrical Building, One (1) Generator Circuit Breakers, One (1) Main Transformers, One (1) STG Auxiliary Transformers)

4. Auxiliary Facilities

5. Ancillary Facilities
(One (1) Administration Building, One (1) Fire Fighting Station, One (1) Warehouse/ Workshop Building, One (1) Water Treatment labs and offices, One (1) Gasoline Station, One (1) Main Security Office)

6. Mechanical Works
(Fire Protection System, Fire Fighting System, Heating, Ventilation and Air Conditioning System HVAC, Sanitary System, Overhead Cranes)

7. Electrical Works

Construction From: 06/2015
Construction To: 10/2017
Contract Amount (IN "000" US$): 53,400
Archirodon Portion: 100%
Owner: East Delta Electricity Production Company (EDEPC)
ID: 09027

Testimonials

No Testimonials Defined